- **Event Description**: PUBLIC HEARING - PROJECT GREEN MOUNTAIN DATA CENTER

An industrial scale data center campus has been proposed in Archbald.

This hearing is part of the formal approval process for Project Green Mountain, a large data center development proposed along the Casey Highway corridor.

📍 Public Hearing
Thursday, March 19, 2026
5:00 PM
Valley View High School Auditorium
1 Columbus Drive, Archbald, PA 18403

What Is Being Proposed?
Hearing 1 on March 19th covered testimony from the applicant's civil engineer and a fiscal impact consultant. The engineer's direct testimony was largely a checklist walk through; yes after yes to ordinance compliance questions with substantive answers on noise, air quality, traffic, emergency access, and fire response all deferred to future hearings or later permit stages. 

No air quality modeling was done. No traffic impact study exists yet, only a preliminary scoping application to PennDOT. 

The noise expert was absent entirely. 

The economic consultant's projections fared no better under cross examination: he admitted he had no data center experience, his job numbers were industry averages with no guarantee of local hiring, and his analysis covered only the construction phase. 

The $2.25 million community benefits proposal was a one time milestone structure, not an annual benefit, was met with open skepticism from council. 

Hearing 2 is where the applicant is expected to finally present the noise analysis they punted on the first time.

Project Green Mountain includes:
- Seven (7) two-story data center buildings
- Approximately 138,000 square feet per building footprint (276,000 square feet total per building)
- Backup generator yards supporting the campus
- A PP&amp;L-owned switchyard and customer substation
- Large stormwater detention basins designed for storage and reuse
- Internal secured access drives and emergency access routes
- A boulevard-style entrance to Salem Road (SR-1012) providing access to the campus
- Development across approximately 270 acres of land

The proposed site is located on the east side of the Casey Highway (SR-6) on land that was formerly quarried.

The project spans multiple zoning districts including:
- Mining (M)
- Coal Mining (CM)
- Resource Conservation (R-C)
- Commercial / Light Industrial (C/LI)



Why This Hearing Matters

This hearing is part of the conditional use approval process required under the borough zoning ordinance.

During these hearings:

The developer presents expert testimony

Borough officials evaluate compliance with the zoning ordinance

Testimony becomes part of the official legal record

Conditional use approval is not automatic.

The applicant must demonstrate compliance with every required standard in the zoning ordinance and data center overlay district, including:

Environmental protections

Infrastructure capacity

Site design standards

Compatibility with surrounding districts

Operational impacts

If the applicant fails to meet required criteria, Borough Council has the authority to deny the application.

You Do NOT Need to Speak

You do not need to be an expert.

You do not need to cross-examine witnesses.

But community presence matters:

- A full room signals community interest
- Public attendance encourages thorough review
- Numbers matter in land-use decisions

These hearings shape the long-term direction of development in Archbald.

This Is About Long-Term Direction

Projects of this scale affect communities for decades.

Decisions like this influence:

- Property values
- Infrastructure demand
- Environmental conditions
- Traffic patterns
- The long-term character of the borough

📌 Mark your calendar
📌 Invite neighbors
📌 Share this event

March 19 at 5 PM

Let’s make sure the community is seen, heard, and on the record.
- **Event URL**: https://allevents.in/archbald/project-green-mountain-second-conditional-use-hearing/200029987703748
- **Interested Audience**: 
  - total_interested_count: 0

## Ticket Details


## Event venue details

- **city**: Archbald
- **state**: PA
- **country**: United States
- **location**: Valley View High School (Pennsylvania)
- **lat**: 41.4992
- **long**: -75.5575
- **full address**: Valley View High School (Pennsylvania), 1 Columbus Dr, Archbald, PA 18403-1538, United States

## Event gallery

- **Alt text**: Project Green Mountain - Second Conditional Use Hearing
  - **Image URL**: https://cdn-az.allevents.in/events6/banners/6eb6209f29adc4e62ebe538e12331ca93545b8a07b2b1fc6c8aa775b8d12edf8-rimg-w630-h630-dc795c32-gmir?v=1777210127

## FAQs

- **Q**: When and where is Project Green Mountain - Second Conditional Use Hearing being held?
  - **A:** Project Green Mountain - Second Conditional Use Hearing takes place on Mon, 11 May, 2026 at 05:00 pm to Mon, 11 May, 2026 at 09:00 pm at Valley View High School (Pennsylvania), 1 Columbus Dr, Archbald, PA 18403-1538, United States.
- **Q**: Who is organizing Project Green Mountain - Second Conditional Use Hearing?
  - **A:** Project Green Mountain - Second Conditional Use Hearing is organized by Justin Healey.
- **Q**: Who is this event for? Is it right for me?
  - **A:** Project Green Mountain - Second Conditional Use Hearing is ideal for professionals, entrepreneurs, startup founders, and networking enthusiasts eager to grow their connections. Whether you're a first-time attendee or a longtime enthusiast in Archbald, this event is thoughtfully curated to deliver a standout experience worth every moment. If Project Green Mountain - Second Conditional Use Hearing sounds like your kind of event, don't wait - spots fill up fast.

## Structured Data (JSON-LD)

```json
[
    {
        "@context": "https://schema.org",
        "@type": "Event",
        "name": "Project Green Mountain - Second Conditional Use Hearing",
        "image": "https://cdn-az.allevents.in/events6/banners/6eb6209f29adc4e62ebe538e12331ca93545b8a07b2b1fc6c8aa775b8d12edf8-rimg-w630-h630-dc795c32-gmir?v=1777210127",
        "startDate": "2026-05-11T17:00:00-04:00",
        "endDate": "2026-05-11T21:00:00-04:00",
        "url": "https://allevents.in/archbald/project-green-mountain-second-conditional-use-hearing/200029987703748",
        "eventStatus": "https://schema.org/EventScheduled",
        "location": {
            "@type": "Place",
            "name": "Valley View High School (Pennsylvania)",
            "address": {
                "@type": "PostalAddress",
                "streetAddress": "1 Columbus Dr, Archbald, PA 18403-1538, United States",
                "addressLocality": "Archbald",
                "addressRegion": "PA",
                "addressCountry": "US"
            },
            "geo": {
                "@type": "GeoCoordinates",
                "latitude": "41.4992",
                "longitude": "-75.5575"
            }
        },
        "eventAttendanceMode": "https://schema.org/OfflineEventAttendanceMode",
        "description": "PUBLIC HEARING - PROJECT GREEN MOUNTAIN DATA CENTER\n\nAn industrial scale data center campus has been proposed in Archbald.\n\nThis hearing is part of the formal approval process for Project Green Mountain, a large data center development proposed along the Casey Highway corridor.\n\n📍 Public Hearing\nThu",
        "organizer": [
            {
                "@type": "Organization",
                "name": "Justin Healey",
                "url": "https://allevents.in/org/justin-healey/27356641"
            }
        ]
    }
]
```